|  Register
You are here : Projects  >  St. Joe, Canal to Creyts
St. Joe Hwy, from Canal Rd to Creyts Rd

March 28, 2016

Start Date:  July 2016

Completion Date:  September 15, 2016

Township: Delta

Description:  This project will resurface St. Joe Highway between Canal Road and Creyts Rd in Delta Township. The road surface will be milled and new asphalt will be placed for the entire length. In addition to resurfacing, areas that have settled at the Carrier Creek and between address numbers 6722 and 6640 will be repaired.

Bids are expected to be opened by the Michigan Department of Transportation (MDOT) on June 3, 2016.

Federal Urban Surface Transportation Block Grant Program funds will pay 81.85% of the estimated $662,000 contracted construction costs on the project. The local matching costs not covered by grant funds plus design and construction engineering will be paid from Road Commission funds.

During construction, St. Joe Highway between Canal Road and Creyts Road will be closed to through traffic.

Contact: Mathew Hannahs, P.E. | 517-543-1630 ext. 207

Like us on Facebook for updates.