Expected Start Date: May 10, 2021
Expected Completion Date: Early July
Township: Benton & Eaton
Description: Otto Road is scheduled to be rehabilitated beginning on May 10, 2021. Work will include trenching along each side of the road, placing gravel across the entire road width, and crushing and shaping the existing pavement, and paving 30 feet wide with gravel shoulders. Work is expected to take no more than two months.
During the project, the road will be closed to thru traffic. There will be short times when culverts are removed or equipment is blocking the road when access will only be possible from one direction. Other than short periods when work is occurring immediately at a driveway, driveway access will be maintained. Your patience is appreciated as we work to improve these 2.4 miles of road.
Mailboxes will be temporarily removed during this project and placed in each yard. After all work is complete, mailboxes will be reinstalled in the original location. Mail service will be maintained with temporary mailboxes located where required by the Post Master as follows:
If you have any questions, you may locate the Eaton County Road Commission Inspector on site, or you may contact, Mathew Hannahs, P.E.
Contact: Mathew Hannahs, P.E. | 517-543-1630 ext. 207